• Projects
  • Federal Ministry of Education and Research

Federal Ministry of Education and Research

Between the Charité and the banks of the Spree, not far from the main train station, is the new location for the administrative seat of the Federal Ministry.
The building has been given “gold” according to the standards for sustainable construction of federal buildings (Nachhaltiges Bauen für Bundesgebäude / BNB); certification according to “DGNB Gold” is being striven for.

Related projects

    • Alter Wall

      Project

      The architectural ensemble at Alter Wall 2-32 is composed of five buildings directly next to Hamburg's City Hall. The historically listed block was renovated to house shops, restaurants and high-end office space, including a large interior courtyard. Central importance has been given to the new Bucerius Passage, an arcade with bridge that now serves as a new and important passageway in Hamburg's city center.
      We designed special lighting fixtures for this arcade: a pendant luminaire of a hyperboloid construction that is distinguished by interlaced metal bars from which light rings hang. Hidden in these rings are fixed light points that illuminate the floors and ceilings of the passageway and colonnade. The dimensions of the lighting fixtures vary widely depending on their position in order to match the given spatial dimensions.
      These large-format light objects create a light motif visible from afar that harks back to the grand historical Alster arcades and gives this special place a festive atmosphere in the evenings.

      Building type
      Cul­ture, Of­fice, Mu­se­um, Shop­ping, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Hamburg
      Project time frame
      2016 — 2019
    • MY.B

      Project

      The structure of the "MY.B" facade, with the building's striking soffits and length, led to the idea of illuminating the facade using laser projection.
      The soffits stick out as the prominent structural feature of the building's form and serve as the perfect backdrop for the glancing views along the front. The dynamic of the commuters coming into the city in the morning and leaving in the evenings going northward can be experienced in the similar movement of the light.
      The newest generation of laser technology and automation are used on the "MY.B" building.
      Depending on the situation, the lighting can vary between restrained static motifs and very dynamic geometries with long-distance effects.
      The system consists of two laser projectors that are integrated into bespoke outdoor cases that have been mounted on the upper section of the columns.
      Power consumption is about 90 to 150 Watts max. per projector, which is, for this specific use, about 50% below the requirements for LEED Gold or Platinum Certification and can therefore be considered as the most energy-efficient facade lighting.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2017 — 2020
    • B-One

      Project

      The new corporate headquarters for Berlin Hyp is intended to showcase the bank's sustainable vision while at the same time contributing to the urban development of the surrounding area. Planted terraces, a roof garden and a newly designed inner courtyard bring the greenery of the surrounding streets up to the roof. Photovoltaic modules are integrated into the natural stone façade grid to produce the bank's own electricity. The aim is to achieve DGNB Platinum certification.

      The building offers various zones for a wide range of activities, from active exchange in a team, with customers or in large groups, to concentrated work at individual workstations. Our lighting design includes the public areas such as entrances and atrium, the office floors and the outdoor areas. Workplace lighting controlled by smart technology with the help of sensors not only meets sustainability requirements, but also offers a high degree of individualisation.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2020 — 2024
    • 3-Leipziger

      Project

      At Leipziger Strasse 126, a new office building was constructed. The residential and commercial buildings “The 3 Leipziger” distinguish themselves through a top inner-city location on Leipziger Platz and Potsdamer Platz, across from the historic Bundesrat building and the Federal Ministry of Finance.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2008
    • Federal Ministry for Family, Seniors, Women and Youth

      Project

      New construction of the Federal Ministry along the Glinkastrasse connected up with the pre-war buildings in the Taubenstrasse and Jägerstrasse.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2009