ZVK Berlin

Kardorff Ingenieure conducted a study of the effect on working conditions by a light-deflecting slatted window blind and a light reflector on the ceiling. The design of the natural light system was done by Bartenbach Lichtlabor in 1996.

Related projects

    • Volkswagen Headquarters Germany

      Project

      The multistorey administrative building completed in 1959 underwent thorough refurbishment to meet contemporary expectations of a corporate headquarters. The building received two new entrances with flying roofs that noticeably complement the older building.
      The office lighting design has linear lighting fixtures integrated into the ceiling. The arrangement of luminaires underscores the lightness and refinement of the building in its nocturnal effect. At our suggestion, the luminaires are placed in a channel custom designed by us to include all of the building automation: sprinklers, loudspeakers, ventilation outlets, etc. The space in which to position all of these elements was very constricted, making their placement in the channel a particular challenge that had to be closely coordinated with the architects and building technicians. As a result, the ceiling is now extremely clear in its structure and remains free of any other fixtures or installations.

      Building type
      Of­fice, Mon­u­ment, High­rise
      Location
      Europe, Germany, Wolfsburg
      Project time frame
      2013 — 2018
    • German Health Ministry

      Project

      For the Federal Ministry of Health we designed wall lights made of massive glass blocks. Some of the glass blocks are backed with dichroic color filters and change the perceived color of light depending on the angle of vision. We used blue tones towards the window facade and orange and yellow filters towards the inner back wall.

      Building type
      Mon­u­ment, Cul­ture, Of­fice, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Berlin
      Project time frame
      2019 — 2023
    • Heinrich Campus

      Project

      The workplace as a stage with the most diverse range of areas.
      The lighting design here is based on a system of busbars that are very flexibly fitted with different kinds of luminaires.
      A luminous color of 3000 K and the brilliance of the luminaires, together with the materials, create a special kind of coziness with a highly pleasant liveability in the rooms.

      The foyer and the two floors in the entrance area are multifunctional. A grid of flush-mounted busbars and downlights are integrated into the lamellar structure of the ceiling.

      Building type
      Of­fice
      Location
      Europe, Germany, Düsseldorf
      Project time frame
      2019 — 2022
    • Turmcenter

      Project

      The changing golden light ceiling element was developed by Kardorff Ingenieure uniquely for this project. The lights shine between two metal lattice planes to ensure a special depth effect like a Moirée. A mirror installed on the back side of the lobby additionally stretches the perspective of the hall.

      Building type
      Of­fice, High­rise, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Frankfurt am Main
      Project time frame
      2016
    • MY.B

      Project

      The structure of the "MY.B" facade, with the building's striking soffits and length, led to the idea of illuminating the facade using laser projection.
      The soffits stick out as the prominent structural feature of the building's form and serve as the perfect backdrop for the glancing views along the front. The dynamic of the commuters coming into the city in the morning and leaving in the evenings going northward can be experienced in the similar movement of the light.
      The newest generation of laser technology and automation are used on the "MY.B" building.
      Depending on the situation, the lighting can vary between restrained static motifs and very dynamic geometries with long-distance effects.
      The system consists of two laser projectors that are integrated into bespoke outdoor cases that have been mounted on the upper section of the columns.
      Power consumption is about 90 to 150 Watts max. per projector, which is, for this specific use, about 50% below the requirements for LEED Gold or Platinum Certification and can therefore be considered as the most energy-efficient facade lighting.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2017 — 2020