• UEC Tower 1

      Project

      Material studies were performed for the foyer and the special areas of Tower 1. The planned use of high-grade steel wall and ceiling liners was assessed in terms of light actinism. The images show in reflections of the luminaires how the direction of rolling and the surface pattern influence the light reflection.

      The project was not realized.

      Building type
      Of­fice, Lu­mi­naire
      Location
      Europe, Germany, Frankfurt am Main
      Project time frame
      2003
All results