UEC Tower 1

Material studies were performed for the foyer and the special areas of Tower 1. The planned use of high-grade steel wall and ceiling liners was assessed in terms of light actinism. The images show in reflections of the luminaires how the direction of rolling and the surface pattern influence the light reflection.

The project was not realized.

Related projects

    • Turmcenter

      Project

      The changing golden light ceiling element was developed by Kardorff Ingenieure uniquely for this project. The lights shine between two metal lattice planes to ensure a special depth effect like a Moirée. A mirror installed on the back side of the lobby additionally stretches the perspective of the hall.

      Building type
      Of­fice, High­rise, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Frankfurt am Main
      Project time frame
      2016
    • O2 Headquarters - Uptown Munich

      Project

      The 146 meter-high office high-rise presents itself as the new landmark in direct proximity to the Munich Olympic Stadium. Characteristic are the rounded glass corners on the building’s crown and in the floor plan, as well as the single-wall glass facade with electrically controlled quarter windows for natural ventilation of the office space.

      Building type
      Of­fice, High­rise, Ur­ban Space, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Munich
      Project time frame
      2006