UEC Tower 1

Material studies were performed for the foyer and the special areas of Tower 1. The planned use of high-grade steel wall and ceiling liners was assessed in terms of light actinism. The images show in reflections of the luminaires how the direction of rolling and the surface pattern influence the light reflection.

The project was not realized.

Related projects

    • Allianz Management Institute

      Project

      In Kempfenhausen on the shores of Starnberger See, the Allianz has a training center for its management. A subsequently built subterranean lecture hall was to be provided with daylight to the best extent possible.

      Building type
      Of­fice
      Location
      Europe, Germany, Kempfenhausen
      Project time frame
      2000
    • Procter & Gamble Research Center

      Project

      The research and administrative building for Procter & Gamble is located in Schwalbach am Taunus. The labs and open office areas are arranged around a glass-roofed atrium. Kardorff Ingenieure Lichtplanung was responsible for the daylight design of the facade, atrium and roof.

      Building type
      Of­fice
      Location
      Europe, Germany, Schwalbach am Taunus
      Project time frame
      2000
    • Kaiser Hof

      Project

      Kaiser Hof is positioned as an exclusive office property on Kaiser-Wilhelm-Ring in Cologne. The lighting concept supports the bright and communicative atmosphere of the 12,000 m² rental area. A room-high mirror in the entrance area visually multiplies the distinctive object luminaires.

      Building type
      Of­fice
      Location
      Europe, Germany, Cologne
      Project time frame
      2019
    • ZVK Berlin

      Project

      Kardorff Ingenieure conducted a study of the effect on working conditions by a light-deflecting slatted window blind and a light reflector on the ceiling. The design of the natural light system was done by Bartenbach Lichtlabor in 1996.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      1996 — 1997
    • Spiegel Headquarters

      Project

      The new Spiegel headquarters on the Ericusspitze forms the gateway to Hamburg’s HafenCity. The design by Henning Larsen Architects for the prominent structure won the international competition in 2007. Kardorff Ingenieure Lichtplanung designed the lighting for the special areas and the central atrium.

      Building type
      Of­fice
      Location
      Europe, Germany, Hamburg
      Project time frame
      2011