• Projects
  • BCG- Boston Consulting Group, Berlin

BCG- Boston Consulting Group, Berlin

For the new branch office of the Boston Consulting Group, it was necessary to create a contemporary atmosphere that would particularly appeal to the young consultants and reflect Berlin’s image as a place of awakening.

Related projects

    • Allianz AG Representative Office Berlin

      Project

      A lighting solution was required for a conference room that would allow the user to not only use the light to respond to specific moods, but that would also allow for an unsurreptitious, continual, daylight-oriented, change in lighting. An elliptical luminous ceiling was equipped with diverse lamps which create the necessary color spectrum.

      Building type
      Of­fice, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Berlin
      Project time frame
      2000
    • BCG - Boston Consulting Group

      Project

      For the BCG headquarter in Munich, the goals of the corporate architecture were analyzed before designing the light concept. Kardorff Ingenieure supplemented its team with sociologists, psychologists and business administrators.

      Building type
      Of­fice
      Location
      Europe, Germany, Munich
      Project time frame
      2002
    • Alter Wall

      Project

      The architectural ensemble at Alter Wall 2-32 is composed of five buildings directly next to Hamburg's City Hall. The historically listed block was renovated to house shops, restaurants and high-end office space, including a large interior courtyard. Central importance has been given to the new Bucerius Passage, an arcade with bridge that now serves as a new and important passageway in Hamburg's city center.
      We designed special lighting fixtures for this arcade: a pendant luminaire of a hyperboloid construction that is distinguished by interlaced metal bars from which light rings hang. Hidden in these rings are fixed light points that illuminate the floors and ceilings of the passageway and colonnade. The dimensions of the lighting fixtures vary widely depending on their position in order to match the given spatial dimensions.
      These large-format light objects create a light motif visible from afar that harks back to the grand historical Alster arcades and gives this special place a festive atmosphere in the evenings.

      Building type
      Cul­ture, Of­fice, Mu­se­um, Shop­ping, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Hamburg
      Project time frame
      2016 — 2019
    • Volkswagen Headquarters Germany

      Project

      The multistorey administrative building completed in 1959 underwent thorough refurbishment to meet contemporary expectations of a corporate headquarters. The building received two new entrances with flying roofs that noticeably complement the older building.
      The office lighting design has linear lighting fixtures integrated into the ceiling. The arrangement of luminaires underscores the lightness and refinement of the building in its nocturnal effect. At our suggestion, the luminaires are placed in a channel custom designed by us to include all of the building automation: sprinklers, loudspeakers, ventilation outlets, etc. The space in which to position all of these elements was very constricted, making their placement in the channel a particular challenge that had to be closely coordinated with the architects and building technicians. As a result, the ceiling is now extremely clear in its structure and remains free of any other fixtures or installations.

      Building type
      Of­fice, Mon­u­ment, High­rise
      Location
      Europe, Germany, Wolfsburg
      Project time frame
      2013 — 2018
    • Trianon

      Project

      The Trianon is one of the highest skyscrapers in Frankfurt. Kardorff Ingenieure’s design for the ceiling and lighting shapes the new image of the building from the street facade through the lobby all the way to the elevators.

      Building type
      Of­fice, Sys­tem De­vel­op­ment
      Location
      Europe, Germany, Frankfurt am Main
      Project time frame
      2014