Vodafone Campus

The innovative architectural design of the new headquarters for Vodafone in Germany reflects the team-oriented corporate structure. It connects high user quality with energy efficiency. The building is certified with LEED gold.

Related projects

    • Volkswagen Headquarters Germany

      Project

      The multistorey administrative building completed in 1959 underwent thorough refurbishment to meet contemporary expectations of a corporate headquarters. The building received two new entrances with flying roofs that noticeably complement the older building.
      The office lighting design has linear lighting fixtures integrated into the ceiling. The arrangement of luminaires underscores the lightness and refinement of the building in its nocturnal effect. At our suggestion, the luminaires are placed in a channel custom designed by us to include all of the building automation: sprinklers, loudspeakers, ventilation outlets, etc. The space in which to position all of these elements was very constricted, making their placement in the channel a particular challenge that had to be closely coordinated with the architects and building technicians. As a result, the ceiling is now extremely clear in its structure and remains free of any other fixtures or installations.

      Building type
      Of­fice, Mon­u­ment, High­rise
      Location
      Europe, Germany, Wolfsburg
      Project time frame
      2013 — 2018
    • Allianz Headquarters Switzerland

      Project

      For the new construction of the Allianz headquarters in the Richti-Areal in Wallisellen Zurich, the ergonomics of the workstation lighting were of great importance, as was the energy efficiency of the interior illumination (“minergie”).

      Building type
      Of­fice
      Location
      Europe, Switzerland, Zurich
      Project time frame
      2014
    • House Haller

      Project

      A world-ranking educational institution came into being in Hamburg. In eight buildings near the Außenalster internationally renowned scientists will do research on current topics and continue to learn together. Their findings will be shared with the public in an auditorium.
      Haller House was the first of these buildings to be completed and already houses scientists and researchers. We illuminated this heritage building with great restraint yet strong accentuation of its architectural structure. One special feature is the staircase lighting. It consists of an arrangement of simple balls of light that are fitted with special LED boards to deliver long-term, high-quality light. Close cooperation with the aspiring and detail-oriented interior designer, Ms. Klatten, made this degree of quality possible.

      Building type
      Of­fice, Cul­ture, Mon­u­ment
      Location
      Europe, Germany, Hamburg
      Project time frame
      2020 — 2023
    • MY.B

      Project

      The structure of the "MY.B" facade, with the building's striking soffits and length, led to the idea of illuminating the facade using laser projection.
      The soffits stick out as the prominent structural feature of the building's form and serve as the perfect backdrop for the glancing views along the front. The dynamic of the commuters coming into the city in the morning and leaving in the evenings going northward can be experienced in the similar movement of the light.
      The newest generation of laser technology and automation are used on the "MY.B" building.
      Depending on the situation, the lighting can vary between restrained static motifs and very dynamic geometries with long-distance effects.
      The system consists of two laser projectors that are integrated into bespoke outdoor cases that have been mounted on the upper section of the columns.
      Power consumption is about 90 to 150 Watts max. per projector, which is, for this specific use, about 50% below the requirements for LEED Gold or Platinum Certification and can therefore be considered as the most energy-efficient facade lighting.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2017 — 2020
    • Atrium Tower

      Project

      Extensive modernization of the former Debis building with the Renzo Piano Building Workshop. Kardorff Ingenieure supervised the DGNB gold-certified project from planning to execution for the 22-storey, 106 meter-high office tower, the spectacular atrium with adjacent lobbies and entrances, as well as the new exterior illumination. Already completed in 2015, the Sky Office showroom is located on the eleventh floor.

      Building type
      Of­fice, High­rise
      Location
      Europe, Germany, Berlin
      Project time frame
      2015